Possum Kingdom Waterline
AO Services handled the oversight and installation of essential underground wet utility upgrades for the City of Abilene at Possum Kingdom, reinforcing the area’s infrastructure with advanced waterline systems. Key project details include:
Waterline Installation:
Installed over 38,000 linear feet of 12-inch waterline to support water supply needs and improve distribution efficiency
Specialized Installation Techniques:
Utilized Horizontal Directional Drilling (HDD) bores and jacks for seamless and precise waterline placement
Check out this REEL highlighting our Possum Kingdom project!