Cotton Bottom Site Development

AO SERVICES was hired to develop a site in Temple, Texas in preparation for a residential neighborhood. AO SERVICES handled excavation and embankment, subgrade prep, ribbon curb, sidewalks, retention pond, and water improvements as well as flex base, headwalls, channels, trickle channels storm drainage improvements – various sizes of RPC(reinforced concrete pipe), headwalls, channels, slope end treatments, rock rip rap, concrete trickle channels

  • Erosion controls

  • Storm drainage improvements - various sizes of RPC

  • Excavation & embankment

  • Asphalt paving, sidewalks, and curbs

  • Retention Pond

View a cul-de-sac compaction IG Reel here and our team training on GSP system improvements here.

We are looking forward to beginning Phase II & III later this year.

Previous
Previous

Cherry Peak Site Development

Next
Next

Storage King Wet Utility